PowerFirst

United States · In development

The first integrated U.S. pilot.

Energy, physical infrastructure and compute.
The first integrated U.S. pilot is in development.

Industrial gas-processing plant and surrounding land.

Connect energy to useful compute.

Demonstrate the complete integration pathway: from an energy resource and a development site to commissioned infrastructure and monetisable compute capacity.

01 / INTENDED SCOPE

Energy

A dedicated power strategy aligned with the pilot’s load, operating duty and development requirements.

02 / INTENDED SCOPE

Infrastructure

Modular data-centre infrastructure, with electrical distribution, cooling and commissioning considered together.

03 / INTENDED SCOPE

Compute

GPU infrastructure and compute management integrated around a defined customer and service requirement.

Prove the integration. Then refine the model.

01

Align the physical systems

Bring the power strategy, data-centre design and compute requirement into a coherent deployment specification.

02

Establish service accountability

Define commissioning, operating responsibilities, support and the intended customer experience.

03

Create a repeatable template

Use the pilot to inform modular design, operating procedures and future deployment decisions.

The pilot remains in development. Commissioned capacity, customer availability and delivery dates have not been announced.

Repeat the discipline. Adapt to the site.

The goal is to carry proven integration methods into further developments, while assessing land, power, permissions and commercial requirements locally.

Explore the wider platform

Discuss the development with PowerFirst.

For prospective customers, infrastructure partners and strategic capital.

Discuss a partnership