Example site report

Example report. Not a live site and not an offer.

This is how a PowerFirst site report reads. It covers a real area of about 5 km², read on 5 Oct 2026. It is not anyone's plot, and no owner is named. A real report covers your plot, and a person checks every figure before it reaches you.

Example report · not a live site

Near Keighley, West Yorkshire

Yorkshire network area · read 5 Oct 2026 · point 53.860, -1.896

Grid verdict

Promising for power

92/100

Ranked 26th of the screened cells in the Yorkshire network area. No flags raised.

Nearest primary
0.9km
Published headroom
20.2MVA
Time to power, 5 MW
17 to 28months
Route to 10 MW+
Yes

Substation proximity and headroom

  • Nearest primary

    Keighley Direct, 11 kV, 0.9 km away

    PowerFirst grid analysis, 5 Oct 2026

  • Spare demand capacity

    20.2 MVA published at that primary

    PowerFirst grid analysis, 5 Oct 2026

  • Already accepted there

    1.8 MVA of large demand

    PowerFirst grid analysis, 5 Oct 2026

  • Higher-voltage sites

    Keighley 132 kV substation 0.9 km; South Street 33 kV 1.1 km; a transmission line 0.1 km

    PowerFirst grid analysis, 5 Oct 2026

Voltage level and the route to 10 MW+

  • First phase

    5 MW of IT needs about 6.8 MVA, so a 33 kV connection is assumed

    PowerFirst time-to-power model, 5 Oct 2026

  • Route to 10 MW+

    Yes. 20.2 MVA covers 10 MW of IT (about 13.7 MVA)

    PowerFirst time-to-power model, 5 Oct 2026

  • Time to power, 5 MW

    17 to 28 months (P10 to P90), middle 22.5. Confidence high

    Application about 3 months, study 1 to 9, works 7 to 19, energise 1 to 2.

    PowerFirst time-to-power model, 5 Oct 2026

  • Quote standard

    50 to 65 working days for an EHV demand quote

    PowerFirst grid analysis, Mar 2026

  • Bridge power

    A mapped gas pipeline 2.8 km away. Engine fuel costs about half the grid price, fuel only

    PowerFirst market analysis, Jun 2026

Fibre and latency

  • Nearest mapped data centre

    16.8 km

    A proxy for nearby fibre. The full report confirms routes and latency with carriers.

    PowerFirst market analysis, 5 Oct 2026

Tenant demand nearby

  • Mapped data centres

    7 within 25 km, 17 within 50 km, 36 within 100 km

    PowerFirst market analysis, 5 Oct 2026

Investor and capital activity nearby

  • Data centre lending

    2 new registered charges in the last 12 months over data centre operators with sites within 100 km

    Operators with sites 37 km and 86 km away; charges dated 17 Mar 2026 and 30 Dec 2025.

    PowerFirst market analysis, 5 Oct 2026

Planning and policy signals

  • Designations

    Outside green belt and SSSI

    PowerFirst planning and policy analysis, 5 Oct 2026

  • Air quality

    Outside any Air Quality Management Area

    PowerFirst planning and policy analysis, 5 Oct 2026

  • Local opposition or moratoria

    None found

    PowerFirst news watch, 5 Oct 2026

Flood and water

  • Flood

    Point check passed: outside mapped flood zones

    PowerFirst planning and policy analysis, 5 Oct 2026

  • Water

    Not screened here. The full report asks the water company

    PowerFirst site screen, 5 Oct 2026

Indicative land value or lease range

  • Range

    Given for your plot only

    A real report gives a range for your plot, built from cited sales and lease evidence near you. This example covers an area, not a plot, so it shows no figure.

    PowerFirst site screen, 5 Oct 2026

Next steps

  • 1

    Confirm the plot boundary and title

    PowerFirst site screen, 5 Oct 2026

  • 2

    Ask the network operator for a budget estimate at 33 kV

    PowerFirst grid analysis, Mar 2026

  • 3

    Visit the site; then heads of terms if it fits

    PowerFirst site screen, 5 Oct 2026

How this was read

  • Site screen: every H3 cell in the network area is scored for power, speed to power and permitting. Each factor carries its date.
  • Time to power: a range for 5 MW of IT, from published quote standards, network data and stated assumptions. P10 to P90.
  • Capital activity: filings and deals within a set distance, from the last 12 months.
  • Distances and counts are derived values only. Grid cell 871942525ffffff.

Indicative. Not an offer, a valuation or advice. PowerFirst confirms capacity with the network operator and visits the site before anything is agreed. Contains public sector information licensed under the Open Government Licence v3.0. Supported by Northern Powergrid Open Data. © OpenStreetMap contributors.